Difference between revisions of "2014-01-22"

From GlueXWiki
Jump to: navigation, search
(Reports from Technical Groups)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(6 intermediate revisions by 3 users not shown)
Line 26: Line 26:
 
=== Announcements ===
 
=== Announcements ===
 
* [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] February 20-22, 2014
 
* [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] February 20-22, 2014
 +
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2376 Summary of Hall-D Subsystems]
  
 
=== MOU and Contract Status ===
 
=== MOU and Contract Status ===
Line 33: Line 34:
 
* Calorimeters:
 
* Calorimeters:
 
** Calorimetry [[Jan 16, 2014 Calorimetry| January 16, 2014]]
 
** Calorimetry [[Jan 16, 2014 Calorimetry| January 16, 2014]]
 +
** FCAL 1st Cosmic [https://halldweb.jlab.org/wiki/index.php/File:FCAL_1st_cosmic.jpg]
 
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-12-10 | December 10, 2013]]
 
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-12-10 | December 10, 2013]]
 
* Tracking FADC FPGA [[FADC_FPGA_Programming_Jan_14,_2014 |January 14, 2014]]
 
* Tracking FADC FPGA [[FADC_FPGA_Programming_Jan_14,_2014 |January 14, 2014]]
Line 39: Line 41:
 
* PID  
 
* PID  
 
** TOF [[GlueX TOF Meeting, January 16, 2014|January 16, 2014]]
 
** TOF [[GlueX TOF Meeting, January 16, 2014|January 16, 2014]]
** Start Counter [[GlueX Start Counter Meeting, January 9, 2014#Minutes|January 9, 2014]]
+
** Start Counter [[GlueX Start Counter Meeting, January 23, 2014#Minutes|January 23, 2014]]
 
** PID Upgrades [[November 15, 2013 PID Upgrade|November 15, 2013]]
 
** PID Upgrades [[November 15, 2013 PID Upgrade|November 15, 2013]]
 
* Engineering  
 
* Engineering  
Line 52: Line 54:
 
* DAQ/Monitoring/Controls [[OWG Meeting 15-Jan-2014 |January 15, 2014]]
 
* DAQ/Monitoring/Controls [[OWG Meeting 15-Jan-2014 |January 15, 2014]]
 
* Offline Software  
 
* Offline Software  
** Offline [[GlueX Offline Meeting, January 8, 2014|January 8, 2014]]
+
** Offline [[GlueX Offline Meeting, January 22, 2014|January 22, 2014]], Data Challenge [[GlueX Data Challenge Meeting, January 31, 2014|January 31, 2014]]
** Calibration [[January 15, 2014 Calibration| January 15, 2014]]]]
+
** Calibration [[January 15, 2014 Calibration| January 15, 2014]]
 
* Photon Beam and Tagger [[BLTWG Meeting 01/21/2014|January 21, 2014]]
 
* Photon Beam and Tagger [[BLTWG Meeting 01/21/2014|January 21, 2014]]
 
* Physics [[January 13, 2014, Physics Working Group|January 13, 2014]]
 
* Physics [[January 13, 2014, Physics Working Group|January 13, 2014]]

Latest revision as of 16:48, 24 February 2017

Meeting Time and Place

The meeting will be on Wednesday January 22, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Polycom RealPresence App on iOS and Android:

   Call 8542553@gk1.es.net

3.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

Agenda

Announcements

MOU and Contract Status

  • Contracts

Reports from Technical Groups