Difference between revisions of "2013-06-26"

From GlueXWiki
Jump to: navigation, search
(Announcements)
(Reports from Technical Groups)
 
(6 intermediate revisions by one other user not shown)
Line 26: Line 26:
 
=== Announcements ===
 
=== Announcements ===
 
# Solenoid Status
 
# Solenoid Status
# DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
+
# Register for the Software Workshop [[July 2013 Tutorial]]
 +
# DNP Meeting at Jefferson Lab in October. [http://www.aps.org/meetings/abstract/index.cfm Abstract] Deadline July 1.
 +
# Technical Design Report
 +
# PAC Results
  
 
=== MOU and Contract Status ===
 
=== MOU and Contract Status ===
Line 38: Line 41:
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
 
* Calorimeters
 
* Calorimeters
** FCAL 2780/2800 [https://halldweb1.jlab.org/wiki/index.php/File:20130403_114033_resized.jpg]
+
** Calorimetry [[June 18, 2013 Calorimetry|June 18, 2013]]
** Calorimetry [[Apr 23, 2013 Calorimetry|April 23, 2013]]
+
** BCAL Readout [[Jun 25,2013 Readout|June 25, 2013]]
** BCAL Readout [[Apr 30,2013 Readout|April 30, 2013]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-06-20| June 20, 2013]]
* Tracking [[April 24, 2013 Tracking CDC/FDC| April 24, 2013]]
+
* Tracking [[May 22, 2013 Tracking CDC/FDC| May 22, 2013]]
 
** CDC  
 
** CDC  
 
** FDC
 
** FDC
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, April 25, 2013|April 25, 2013]]  
+
** TOF [[GlueX TOF Meeting, June 20, 2013|June 20, 2013]]  
** Start Counter [[GlueX Start Counter Meeting, April 18, 2013#Minutes|April 18, 2013]]
+
** Start Counter [[GlueX Start Counter Meeting, May 16, 2013#Minutes|May 16, 2013]]
** PID Upgrades [[April 19, 2013 PID Upgrade|April 19, 2013]]
+
** PID Upgrades [[May 3, 2013 PID Upgrade|May 3, 2013]]
 
* Engineering  
 
* Engineering  
 
** Magnet
 
** Magnet
 
** Target  
 
** Target  
 
** Engineering Activities
 
** Engineering Activities
** Installation [[April 26, 2013 Installation|April 26, 2013 Installation]]
+
** Installation [[June 21, 2013 Installation|June 21, 2013 Installation]]
 
* Electronics
 
* Electronics
** Technical Design Report
+
* Trigger [[OWG Meeting 19-Jun-2013 |June 19, 2013]]
* Trigger [[OWG Meeting 24-Apr-2013 |April 24, 2013]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 19-Jun-2013 |June 19, 2013]]
* DAQ/Monitoring/Controls [[OWG Meeting 24-Apr-2013 |April 24, 2013]]
+
* Offline [[GlueX Offline Meeting, June 12, 2013|June 12, 2013]]
* Offline [[GlueX Offline Meeting, April 17, 2013|April 17, 2013]]
+
* Photon Beam and Tagger [[BLTWG Meeting 06/24/2013|June 24, 2013]]
* Photon Beam and Tagger [[BLTWG Meeting 04/29/2013|April 29, 2013]]
+
* Physics [[June 17, 2013, Physics Working Group|June 17, 2013]]
* Physics [[April 22, 2013, Physics Working Group|April 22, 2013]]
+
  
 
=== Minutes ===
 
=== Minutes ===

Latest revision as of 10:43, 26 June 2013

Meeting Time and Place

The meeting will be on Wednesday June 26, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Polycom RealPresence App on iOS and Android:

   Call 8542553@gk1.es.net

3.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

Agenda

Announcements

  1. Solenoid Status
  2. Register for the Software Workshop July 2013 Tutorial
  3. DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
  4. Technical Design Report
  5. PAC Results

MOU and Contract Status

Reports from Technical Groups

Minutes