Difference between revisions of "2013-05-15"
From GlueXWiki
(→Announcements) |
(→Announcements) |
||
Line 26: | Line 26: | ||
=== Announcements === | === Announcements === | ||
# Solenoid Status | # Solenoid Status | ||
− | # GlueX [[GlueX-Collaboration-Jun-2013|Collaboration Meeting]] June 3-5 at Jefferson Lab | + | # GlueX [[GlueX-Collaboration-Jun-2013|Collaboration Meeting]] June 3-5 at Jefferson Lab. |
+ | # Physics Analysis Workshop/Tutorial at Jefferson Lab (early-mid July?). | ||
# DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1. | # DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1. | ||
# [[PAC Proposals]] Draft PAC presentations at collaboration meeting. | # [[PAC Proposals]] Draft PAC presentations at collaboration meeting. |
Latest revision as of 09:49, 15 May 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday May 15, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Solenoid Status
- GlueX Collaboration Meeting June 3-5 at Jefferson Lab.
- Physics Analysis Workshop/Tutorial at Jefferson Lab (early-mid July?).
- DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
- PAC Proposals Draft PAC presentations at collaboration meeting.
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- FIU
Reports from Technical Groups
- Calorimeters
- Calorimetry May 7, 2013
- BCAL Readout May 14, 2013
- Tracking April 24, 2013
- CDC
- FDC
- PID
- TOF May 9, 2013
- Start Counter April 18, 2013
- PID Upgrades May 3, 2013
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation May 10, 2013 Installation
- Electronics
- Technical Design Report
- Trigger May 8, 2013
- DAQ/Monitoring/Controls May 8, 2013
- Offline May 1, 2013
- Photon Beam and Tagger May 13, 2013
- Physics May 6, 2013