# Solenoid Status
 
# Solenoid Status
# GlueX [[GlueX-Collaboration-Jun-2013|Collaboration Meeting]] June 3-5 at Jefferson Lab
+
# GlueX [[GlueX-Collaboration-Jun-2013|Collaboration Meeting]] June 3-5 at Jefferson Lab.
 +
# Physics Analysis Workshop/Tutorial at Jefferson Lab (early-mid July?).
 
# DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
 
# DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
 +
# [[PAC Proposals]] Draft PAC presentations at collaboration meeting.
  
 
=== MOU and Contract Status ===
 
=== MOU and Contract Status ===
Line 39: Line 41:
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
 
* Calorimeters
 
* Calorimeters
** FCAL 2780/2800 [https://halldweb1.jlab.org/wiki/index.php/File:20130403_114033_resized.jpg]
+
** Calorimetry [[May 7, 2013 Calorimetry|May 7, 2013]]
** Calorimetry [[Apr 23, 2013 Calorimetry|April 23, 2013]]
+
** BCAL Readout [[May 14,2013 Readout|May 14, 2013]]
** BCAL Readout [[Apr 30,2013 Readout|April 30, 2013]]
+
 
* Tracking [[April 24, 2013 Tracking CDC/FDC| April 24, 2013]]
 
* Tracking [[April 24, 2013 Tracking CDC/FDC| April 24, 2013]]
 
** CDC  
 
** CDC  
 
** FDC
 
** FDC
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, April 25, 2013|April 25, 2013]]  
+
** TOF [[GlueX TOF Meeting, May 9, 2013|May 9, 2013]]  
 
** Start Counter [[GlueX Start Counter Meeting, April 18, 2013#Minutes|April 18, 2013]]
 
** Start Counter [[GlueX Start Counter Meeting, April 18, 2013#Minutes|April 18, 2013]]
** PID Upgrades [[April 19, 2013 PID Upgrade|April 19, 2013]]
+
** PID Upgrades [[May 3, 2013 PID Upgrade|May 3, 2013]]
 
* Engineering  
 
* Engineering  
 
** Magnet
 
** Magnet
 
** Target  
 
** Target  
 
** Engineering Activities
 
** Engineering Activities
** Installation [[April 26, 2013 Installation|April 26, 2013 Installation]]
+
** Installation [[May 10, 2013 Installation|May 10, 2013 Installation]]
 
* Electronics
 
* Electronics
 
** Technical Design Report
 
** Technical Design Report
* Trigger [[OWG Meeting 24-Apr-2013 |April 24, 2013]]
+
* Trigger [[OWG Meeting 8-May-2013 |May 8, 2013]]
* DAQ/Monitoring/Controls [[OWG Meeting 24-Apr-2013 |April 24, 2013]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 8-May-2013 |May 8, 2013]]
* Offline [[GlueX Offline Meeting, April 17, 2013|April 17, 2013]]
+
* Offline [[GlueX Offline Meeting, May 1, 2013|May 1, 2013]]
* Photon Beam and Tagger [[BLTWG Meeting 04/29/2013|April 29, 2013]]
+
* Photon Beam and Tagger [[BLTWG Meeting 05/13/2013|May 13, 2013]]
* Physics [[April 22, 2013, Physics Working Group|April 22, 2013]]
+
* Physics [[May 6, 2013, Physics Working Group|May 6, 2013]]
  
 
=== Minutes ===
 
=== Minutes ===

Latest revision as of 09:49, 15 May 2013

Meeting Time and Place

The meeting will be on Wednesday May 15, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Polycom RealPresence App on iOS and Android:

   Call 8542553@gk1.es.net

3.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

Agenda

Announcements

  1. Solenoid Status
  2. GlueX Collaboration Meeting June 3-5 at Jefferson Lab.
  3. Physics Analysis Workshop/Tutorial at Jefferson Lab (early-mid July?).
  4. DNP Meeting at Jefferson Lab in October. Abstract Deadline July 1.
  5. PAC Proposals Draft PAC presentations at collaboration meeting.

MOU and Contract Status

Reports from Technical Groups

Minutes