Difference between revisions of "2012-10-17"

From GlueXWiki
Jump to: navigation, search
(MOU and Contract Status)
(Reports from Technical Groups)
Line 43: Line 43:
 
** Calorimetry [[Sep 11, 2012 Calorimetry|September 11, 2012]]
 
** Calorimetry [[Sep 11, 2012 Calorimetry|September 11, 2012]]
 
** BCAL Readout [[Sep 18, 2012 Readout|September 18, 2012]]
 
** BCAL Readout [[Sep 18, 2012 Readout|September 18, 2012]]
** Technical Design Report
 
 
* Tracking [[September 12, 2012 tracking CDC/FDC| September 12, 2012]]
 
* Tracking [[September 12, 2012 tracking CDC/FDC| September 12, 2012]]
 
** CDC
 
** CDC
 
** FDC
 
** FDC
** Technical Design Report
 
 
* PID  
 
* PID  
 
** TOF [[GlueX TOF Meeting, September 13, 2012|September 13, 2012]]  
 
** TOF [[GlueX TOF Meeting, September 13, 2012|September 13, 2012]]  
 
** Start Counter [[GlueX Start Counter Meeting, August 23, 2012#Minutes|August 23, 2012]]
 
** Start Counter [[GlueX Start Counter Meeting, August 23, 2012#Minutes|August 23, 2012]]
 
** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]]
 
** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]]
** Technical Design Report
 
 
* Engineering  
 
* Engineering  
 
** Magnet
 
** Magnet
 
** Target  
 
** Target  
 
** Engineering Activities
 
** Engineering Activities
** Technical Design Report
 
 
* Electronics
 
* Electronics
 
** Technical Design Report
 
** Technical Design Report
 
* Trigger [[OWG Meeting 12-Sep-2012 |September 12, 2012]]
 
* Trigger [[OWG Meeting 12-Sep-2012 |September 12, 2012]]
** Technical Design Report
 
 
* DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]]
 
* DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]]
** Technical Design Report
 
 
* Offline  
 
* Offline  
 
** Software Meeting [[GlueX Offline Meeting, September 5, 2012#Minutes|September 5, 2012]]
 
** Software Meeting [[GlueX Offline Meeting, September 5, 2012#Minutes|September 5, 2012]]
 
** Data Challenge [[GlueX Data Challenge Meeting, September 10, 2012|September 10, 2012]]
 
** Data Challenge [[GlueX Data Challenge Meeting, September 10, 2012|September 10, 2012]]
** Technical Design Report
 
 
* Photon Beam and Tagger [[BLTWG Meeting 09/17/2012|September 17, 2012]]
 
* Photon Beam and Tagger [[BLTWG Meeting 09/17/2012|September 17, 2012]]
** Technical Design Report
 
 
* Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]]
 
* Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]]
  
 
=== AOT ===
 
=== AOT ===

Revision as of 14:11, 16 October 2012

Meeting Time and Place

The meeting will be on Wednesday October 17, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

3.) EVO:

   A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
  • To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
  • Skype Bridge to EVO

Agenda

Announcements

MOU and Contract Status

Technical Design Report

Reports from Technical Groups

AOT