Difference between revisions of "2012-01-11"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(One intermediate revision by the same user not shown)
Line 26: Line 26:
 
* Announcements
 
* Announcements
 
* [[GlueX-Collaboration-Feb-2012|Collaboration Meeting]] Feb. 16-18, 2012.
 
* [[GlueX-Collaboration-Feb-2012|Collaboration Meeting]] Feb. 16-18, 2012.
* Updated 12-GeV Physics Case
+
* Reviews and Reports
* Technical Design Report
+
** Updated 12-GeV Physics Case
 +
** Technical Design Report
 +
** Software Review
 
* MOU and Contract Status
 
* MOU and Contract Status
 
** [[Private:MOU Status | MOU Status]]
 
** [[Private:MOU Status | MOU Status]]
Line 41: Line 43:
  
 
** Calorimeters
 
** Calorimeters
*** Calorimetry [[Dec 20, 2011 Calorimetry|December 20, 2011]]
+
*** Calorimetry [[Jan 3, 2012 Calorimetry|January 3, 2012]]
 
*** BCAL Readout [[Dec 13, 2011 Readout|December 13, 2011]]
 
*** BCAL Readout [[Dec 13, 2011 Readout|December 13, 2011]]
 
*** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011|November 28, 2011]]  
 
*** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011|November 28, 2011]]  

Latest revision as of 14:36, 4 January 2012

Meeting Time and Place

The meeting will be on Wednesday January 11, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

3.) EVO:

   A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).

Agenda

  • Announcements
  • Collaboration Meeting Feb. 16-18, 2012.
  • Reviews and Reports
    • Updated 12-GeV Physics Case
    • Technical Design Report
    • Software Review
  • MOU and Contract Status
  • Beam Tests
  • Reports from Technical Groups.