Difference between revisions of "08/19/2020"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
**Target
 
**Target
 
***$600k. Where do the funds come from?
 
***$600k. Where do the funds come from?
***Monpower: target group.  
+
***Manpower: target group.  
 
***Timeline? Will determine when we can say we are ready to run.
 
***Timeline? Will determine when we can say we are ready to run.
 
***Should we organise a meeting with C. Keith?
 
***Should we organise a meeting with C. Keith?

Revision as of 11:02, 19 August 2020

Present: M.D., A.D., S.Š, J.S.,

General:

  • PAC approved the experiment for 33 days with A- rating.
  • Eugene's comments on PAC
  • Move GDH meeting?

S.Š:

J.S.:

M.D.:

A.D.:

  • Need a plan to move forward
    • Invite non-GlueX collaborators?
      • T. Averett, J. P. Chen, T. Holmstrom, C. Peng and X. Zheng have expressed wishes to join.
      • Other people that may be interested: G. Cates, H. Gao, K. Griffioen, S. Kuhn, Z-E. Mezziani, M. Ripani, A. Sandorfi, K. Slifer. People from Ljubljana, Mainz, W&M?
    • Target
      • $600k. Where do the funds come from?
      • Manpower: target group.
      • Timeline? Will determine when we can say we are ready to run.
      • Should we organise a meeting with C. Keith?
    • Electronic equipment
      • $50k Hall D/MCC ops funds?
      • Manpower?
    • Other special equipment (possibly) needed?
      • Beam hardener
    • Test with beam:
      • Rate check on plastic/carbon targets (Compton, B-H)?
      • Trigger studies?
    • Look into adding tagger into trigger?
    • Low energy run
    • Students