(Created page with "Present: M.D., A.D., S.Š, J.S., General: PAC approved the experiment for 33 days with A<sup>-</sup> rating. S.Š: J.S.: M.D.: A.D.:")
 
Line 1: Line 1:
 
Present: M.D., A.D., S.Š, J.S.,  
 
Present: M.D., A.D., S.Š, J.S.,  
  
General: PAC approved the experiment for 33 days with A<sup>-</sup> rating.  
+
General:  
 +
*PAC approved the experiment for 33 days with A<sup>-</sup> rating.  
 +
*Eugene's comments on PAC
 +
*Move GDH meeting to 10am?
 +
 
  
  
Line 11: Line 15:
  
 
A.D.:
 
A.D.:
 +
*Need a plan to move forward
 +
**Invite non-GlueX collaborators?
 +
***T. Averett, J. P. Chen, T. Holmstrom, C. Peng and X. Zheng have expressed wishes to join.
 +
***Other people that may be interested: G. Cates, H. Gao, K. Griffioen, S. Kuhn, Z-E. Mezziani, M. Ripani, A. Sandorfi, K. Slifer. People from Ljubljana, Mainz, W&M?
 +
**Target
 +
***$600k. Where do the funds come from?
 +
***Monpower: target group.
 +
***Timeline? Will determine when we can say we are ready to run.
 +
***Should we organise a meeting with C. Keith?
 +
**Electronic equipment
 +
***$50k Hall D/MCC ops funds?
 +
***Manpower?
 +
**Other special equipment (possibly) needed?
 +
***Beam hardener
 +
**Test with beam:
 +
***Rate check on plastic/carbon targets (Compton, B-H)?
 +
***Trigger studies?
 +
**Look into adding tagger into trigger?
 +
**Students

Revision as of 09:50, 19 August 2020

Present: M.D., A.D., S.Š, J.S.,

General:

  • PAC approved the experiment for 33 days with A- rating.
  • Eugene's comments on PAC
  • Move GDH meeting to 10am?


S.Š:

J.S.:

M.D.:

A.D.:

  • Need a plan to move forward
    • Invite non-GlueX collaborators?
      • T. Averett, J. P. Chen, T. Holmstrom, C. Peng and X. Zheng have expressed wishes to join.
      • Other people that may be interested: G. Cates, H. Gao, K. Griffioen, S. Kuhn, Z-E. Mezziani, M. Ripani, A. Sandorfi, K. Slifer. People from Ljubljana, Mainz, W&M?
    • Target
      • $600k. Where do the funds come from?
      • Monpower: target group.
      • Timeline? Will determine when we can say we are ready to run.
      • Should we organise a meeting with C. Keith?
    • Electronic equipment
      • $50k Hall D/MCC ops funds?
      • Manpower?
    • Other special equipment (possibly) needed?
      • Beam hardener
    • Test with beam:
      • Rate check on plastic/carbon targets (Compton, B-H)?
      • Trigger studies?
    • Look into adding tagger into trigger?
    • Students