(Created page with "Present: M.D., A.D., S.Š General: **Quorum: do we need to write a GDH-specific appeal letter? **Elton's comments (only one from the collaboration so far). *M.D: **Provid...")
 
m
Line 4: Line 4:
 
**Quorum: do we need to write a GDH-specific appeal letter?
 
**Quorum: do we need to write a GDH-specific appeal letter?
 
**Elton's comments (only one from the collaboration so far).
 
**Elton's comments (only one from the collaboration so far).
 +
**Goal: submit the proposal sometimes Friday 19th (best) or this week end (acceptable), or Monday before 8am (deadline). What's left to be done for the proposal to be ready?
  
  

Revision as of 08:12, 17 June 2020

Present: M.D., A.D., S.Š

General:

    • Quorum: do we need to write a GDH-specific appeal letter?
    • Elton's comments (only one from the collaboration so far).
    • Goal: submit the proposal sometimes Friday 19th (best) or this week end (acceptable), or Monday before 8am (deadline). What's left to be done for the proposal to be ready?


  • M.D:
    • Provided estimate for the trigger rates and trigger+tagger rates from BH and Compton. Large rates are found, limiting our DAQ rate and reducing our stats by a factor of 0.36.
    • Implemented some of Elton's comments.


  • S.Š:
  • J. S.:
  • A. D.:
    • Wrote to the collaboration re. new version of the proposal. (No reply at all.)
    • Added a small discussion on polarized background (Polarized Compton background is nearly fully suppressed because of the GDH SR on electron and because it's integrant is significant only near the electron mass << our nu)
    • Implemented Mark's results on BH and Compton background in the proposal. In particular, we now have a decent section on unpolarized backgrounds rather than a space-holder.
    • Updated the figures, photon flux used, accidental background, precision reached, run-time discussions to account of the ~2/3 drop in statistics.
    • We now propose to run 10 days at 4 GeV instead of 5 days (12 GeV run remains at 17 days).
    • Implemented some of Elton comments left after Mark's pass at them.