GlueX Target Design Mtg, April 21, 2014
From GlueXWiki
Revision as of 07:51, 21 April 2014 by Whitey (Talk | contribs) (Created page with "Present: Chris Keith, Dave Meekins, Josh Pierce, James Brock, Matt Marchlik, Dave Butler, Alexandre Deur, Tim Whitlatch Minutes from last mtg ==Agenda== * Where are we now? ...")
Present: Chris Keith, Dave Meekins, Josh Pierce, James Brock, Matt Marchlik, Dave Butler, Alexandre Deur, Tim Whitlatch
Minutes from last mtg
Contents
Agenda
- Where are we now?
- Cryo hardware status
- Gas system status
- Exhaust from pressure relief
- Plumbing on cart
- pressure system documentation
- Storage tanks
- 3D model/drawings
- Target/Start counter interface
- Vacuum system update
- Flange config
- Controls status
- updated P&I
- changes for subcooled config
- Installation cart update
- Tank config
- Lifting
- Controls/panel config
- Alignment features
- Scattering chamber status
- Cell Fabrication Status
- thermometry
- Spare cell
- Schedule
- Readiness review
- Assy/test in EEL
- Install/test in Hall
Info
- P&I Diagram Media:Target P&I.pdf
- Controls logic Media:Target controls.pdf
- Dave's SOW Media:Target new SOW.pdf
- Dave's Calcs Media:Target calcs1.pdf Media:Target calcs2.pdf
- Dave's FMEA Media:Target latest FMEA.pdf