Controls Meeting 23-Jan-2014
From GlueXWiki
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 9-Jan-2014
- UPS requirements for Hall D
- Total maximum power consumed by PLC, location in the hall (Dave)
- Total maximum power consumed by solenoid controls, location in the hall (Yi)
- Total maximum power consumed by motor controls, location in the hall (Hovanes)
- Expected power usage and required time duration during power failure for PLC device (Dave)
- Expected power usage and required time duration during power failure for solenoid controls (Yi)
- Expected power usage and required time duration during power failure for motor controls (Hovanes)
Time/Location
9:30AM Thurs 23-Jan-2014 CC A110