Controls To Do List

From GlueXWiki
Revision as of 09:04, 3 June 2011 by Wolin (Talk | contribs)

Jump to: navigation, search
  • Should we use ControlNet as well as Ethernet/IP?
    • Would we have to run a copper line to the counting house?
    • Should we use an additional PLC in the hall?
    • Should we locate the main PLC in the hall?
  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Should the FDC gas system use just PLC control and not use a PC104?