JEF meeting, January 31, 2025

From GlueXWiki
Revision as of 09:19, 31 January 2025 by Somov (Talk | contribs) (Agenda)

Jump to: navigation, search

Connection

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

-The LMS light source should be ready in the beginning of next week (the flange was machined, the PCB box under preparation); will start testing.
-More powerful fans will be installed in the central region (Tim)

-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [1]
- Six VTPs have been installed, firmware loaded
- Testing GTP trigger using individual ECAL VXS crates [2]
  • Commissioning the entire detector using the LMS (signal waveforms)
- Signal waveforms after resolving issues with the ECAL modules [3]
- Long-term stability check [4]
List of cosmic runs
  • ECAL HV interlock check [5]
  • HV module failed during cosmic run [6]
  • Tuning HV settings [7]
  • Material in front of the ECAL, TOF absorber [8][9]
  • Temperature scan in the ECAL divider region [10][11][12]
Fans replaced in the central region [13]
Lower detector high voltages [14]
Temperature of the NPS detector[15]
2 temperature sensors in the divider region connected, fan included into the detector interlock [16] -- Josh, Bobby
Temporary temperature sensors installed in the ECAL region [17]
  • Preparing for the run -- Sasha
Page for shift Takers
ECAL in the Experimental Safety Assessment Document (ESAD)
EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)

Restoring PS test setup [18]

Working on the plan for testing calorimeter prototype

ECAL commissioning -- Sasha, All

Calibrations

Preparations for readiness review Review wiki page