JEF meeting, September 27, 2024
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Upcoming presentations (from the speaker contact person aka Su)
- discuss upcoming DNP (practice) talk
Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors
- - Sent out request of quotes for HV boards
- - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]
Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains - done
- - need to arrange cables on cable trays - done [5]
- - preparing spare cables (7 short HV, 8 signal and LV) -done
- Installation of the light distribution board of the ECAL LMS [6]
- Implementing ECAL into the GlueX DAQ [7]
- - rocecal3 crate is working now [8]
- - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done
- Detector installation page
- Safety briefings
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- - Test cooling system (next week)
- - Installing HV distribution boards, start switching the detector ON - waiting for HV boxes
- - Checking cooling system
Students -- Sasha
- Visit of Zhikun from Wuhan
Restoring PS test setup [9]
ECAL commissioning -- Sasha, All