JEF meeting, September 27, 2024
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Upcoming presentations (from the speaker contact person aka Su)
- discuss upcoming DNP (practice) talk
Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors
- - Sent out request of quotes for HV boards
- - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]
Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains - done
- - need to arrange cables on cable trays - done [5]
- - preparing spare cables (7 short HV, 8 signal and LV) -done
- Installation of the light distribution board of the ECAL LMS [6]
- Implementing ECAL into the GlueX DAQ [7]
- Detector installation page
- Safety briefings
- Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- - Test cooling system (next week)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Students -- Sasha
- Visit of Zhikun from Wuhan
Restoring PS test setup [11]
ECAL commissioning -- Sasha, All
Minutes
Attendees: Xiaolin, Sasha, Olga, Igal, Susan, Laveen, Stjepan, Vlad, Liping, Jane, S.T.
- Waiting for student from Jane's group
- Vote for Xiaolin's group to join GlueX ongoing
- All long HV cables done, one more bundle in hall
- HV boards sent out for quotes
- Time frame 3 weeks? Then another 4 weeks to install and finish final detector checkout?
- LV panels received and installed
- Some optical fibers for LMS need to be fixed
- Need to install reference PMTs + alpha source for LMS
- Tech crew working on infrastructure (insulation, piping, testing chilling system)
- Sasha fixed problem with ecalroc3
- Trigger for LMS instrumented in front panel of trigger electronics
- DAQ running: online scalers, digihits
- Sasha working on commissioning plan
- Vlad to continue working part-time on FCAL-2
- Laveen continuing work on close shower separation