Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable: Sammy and Mindy have to assemble 10 cables
    • - HV distribution boards [1][2]
    • - Fix front panel of two LV distribution boards, re-install the boards on the detector frame [3]
    • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Report from students [4]
    • Installation of HV cables [5][6]
- two remaining bundle of cables will be ready in about a week
  • Students -- Sasha
    • - Expect one student from Wuhan, waiting for the US visa
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • Analysis/Simulation