JEF meeting, September 6, 2024

From GlueXWiki
Jump to: navigation, search

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

  • - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
  • - HV distribution boards [1][2]
- 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
  • - Fix front panel of two LV distribution boards [3]
- new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
  • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)

Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen

  • Installation and testing dividers has been completed [4]
- need to arrange cables on chains
- need to arrange cables on cable trays

Students -- Sasha

  • - Expect one student from Wuhan, waiting for the US visa

ECAL commissioning -- Sasha, All

Beam tests with the PS

  • measure shower beam profile and reconstruction in the crystal/LG transition region
  • (install prototype with 5x5 PbWO4 modules + ? LG)

Other hardware projects

  • prototype of the ECAL veto counter (?)

Analysis/Simulation

Minutes

Attendees: Sasha, Zisis, Susan, Xiaolin, Igal, Phil, Laveen, Jane, Ilya, Liping, Axel, Bill, Stjepan, Malte, Vlad, S.T.

  • Xiaolin gave a short presentation introducing herself and her group to our group
  • 2 HV cable assemblies are being completed
  • Chris S. received first articles of HV distribution boards, tested okay, green light given to produce the rest
  • Final design of HV distribution box delayed
  • LV distribution boards needed to be adjusted, waiting for 2 plates
  • LMS protytype testing to resume, considering adding LEDs
  • Major milestone: all PMT dividers installed!
    • Velcro straps installed between chains
    • Cables still need to be organized more neatly
    • Spare cables added inside dark room
  • Sasha started ECAL commissioning wiki page
    • Run plan for detector calibration
      • Use Compton scattering to start, π0 events final calibration
    • Plan for rough gain equalization at ~10% level
  • Plan to start work on integrating ECAL into DAQ week of 9/9/24
  • Start commissioning lead glass region after collaboration meeting
  • Still considering using PS setup in Hall to study shower profile, look at lead glass/pwo transition region?
  • Liping brought up feasibility of reinstalling downstream muon detector (could expand JEF physics reach)
  • Laveen gave an update on close shower separation studies using HyCAL simulation+code
  • Bill reminded us of SULI summer student program