Run Planning Meeting Notes, September 10 - 16, 2020
From GlueXWiki
Revision as of 08:19, 10 September 2020 by Deurpam (Talk | contribs) (→Thursday, September 10 at 8:45)
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Thursday, September 10 at 8:45
- Last 24 hours:
- Reports/issues:
- Run plan
- Continue production runs
- Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
- Tuesday Sept. 15th: 3h of beam study expected
- Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
- Special tasks remaining:
- Beam rastering test
- Periodic harp Scans (last one done on Sept. 5th). The rates and transmission have been stable
- Empty target run?