Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • # Trigger emulation --- Alex Somov # Triggering efficiency --- Alex Somov
    8 KB (1,162 words) - 17:35, 13 September 2017
  • # Trigger emulation --- Alex Somov # Triggering efficiency --- Alex Somov
    7 KB (1,119 words) - 17:56, 20 September 2017
  • * Discussed with Alex Somov, Hovanes and Eugene: Agree that this should help with TAC runs: Wire radiat
    2 KB (350 words) - 11:26, 25 September 2017
  • ....org/DocDB/0033/003375/005/l1_simu_status2.pdf Trigger emulation] --- Alex Somov # Triggering efficiency --- Alex Somov
    5 KB (753 words) - 16:58, 27 September 2017
  • ...ments to assess background for PRad target TAC runs.]] (A. Deur/Hovanes/A. Somov 1h×2) ** High-intensity GlueX L1 tests (A. Somov) (2 instances of 2h separated by a day, I≈500nA)
    28 KB (4,381 words) - 16:26, 26 November 2018
  • Attendees: L. Gan, Z. Papandreou, A. Somov, S. Taylor
    2 KB (380 words) - 12:33, 12 December 2017
  • Attendees: J. Crafts, L. Gan, S. Glamazdin, Z. Papandreou, S. Somov, S. Taylor, *S. Somov reported that an assembly of iron tubes will be assembled and studied with
    2 KB (386 words) - 17:12, 13 December 2017
  • <tr><td>4<td>3380.35<td>somov
    7 KB (1,137 words) - 14:52, 21 February 2018
  • ...DocDB/ShowDocument?docid=3547 Systematics for the lumi determination] - A. Somov ...jlab.org/doc-private/DocDB/ShowDocument?docid=3550 L1 Trigger Status] - A. Somov
    10 KB (1,232 words) - 10:59, 24 February 2018
  • ...B/ShowDocument?docid=3895 Photoprodcution of Vector Mesons off Nuclei] - A.Somov ...ate/DocDB/ShowDocument?docid=3902 Fall 2018 PrimEx Commissioning] --- Alex Somov
    11 KB (1,461 words) - 07:39, 14 March 2019
  • ...r only two collaborators have offered suggestions (thanks Simon and Sascha Somov). Collaborators are encouraged to read it and comment. The paper can be fou
    2 KB (333 words) - 21:25, 8 February 2018
  • *Converter thickness study (A. Somov, 2h) *L1 trigger and SSP studies (A. Somov, 2h)
    3 KB (478 words) - 16:22, 23 March 2018
  • ...ocument?docid=3684 Improved beam flux normalization from TAC runs] --- A. Somov ...te/DocDB/DisplayMeeting?sessionid=776 Online/DAQ/Trigger] - (Organizer: A. Somov) - Chair: Mark Ito
    11 KB (1,443 words) - 10:44, 23 June 2018
  • ...been successfully integrated into the standard production trigger by Sasha Somov
    8 KB (1,167 words) - 17:58, 25 January 2019
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=3774 Trigger Status] --- A. Somov ...jlab.org/doc-private/DocDB/ShowDocument?docid=3778 PrimeEx Running] - Alex Somov
    11 KB (1,360 words) - 11:57, 29 September 2018
  • *** High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov) ***ComCal commissioning (no B-field, no DC on) (A. Somov) [https://halldweb.jlab.org/wiki/images/6/68/Run_Plan_Fall_2018-v3.jpg] [ht
    24 KB (3,652 words) - 12:48, 12 December 2018
  • #* [https://logbooks.jlab.org/entry/3628470 FCal HV scan] (A. Somov) #* 30 min FCal scan (A. Somov)
    9 KB (1,262 words) - 05:07, 22 November 2018
  • #*PS detector threshold scan. (A. Somov, 1h) <font color="magenta">Can be done early if necessary: nominal beam qua ...Jones <!-- 860-377-5224--> 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
    27 KB (4,215 words) - 08:36, 10 April 2019
  • ...ghly 1&nbsp;kHz. This will require a special DAQ configuration, but Sascha Somov has told us that that is not a problem. We might consider reading out the o
    2 KB (395 words) - 11:53, 24 January 2019
  • ...Document?docid=4033 Status of the CompCal tests and future plans] --- Alex Somov ...c-private/DocDB/DisplayMeeting?sessionid=838 Trigger/DAQ] - (Organizer: A. Somov) - Chair: Hovannes
    15 KB (1,912 words) - 13:23, 16 May 2019

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)