FCAL Insert

From GlueXWiki
Revision as of 12:24, 28 January 2025 by Somov (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

PWO Crystals

PMT & Divider

Light Guide

Electronics

Module Design

Frame and Engineering

Light monitoring system

FCAL Insert Module Fabrication


FCAL Installation

Detector Alignment

ECAL Commissioning

Contents

 [hide] 
  • 1 Meetings
  • 2 Status Reports
  • 3 FCAL2 Readiness Review
  • 4 Supplementary Material

Meetings

JEF Meetings

FCAL2 Installation Meetings

Insert Design Meetings

Meeting on design of CCAL/FCAL2 dividers

Meetings with SICCAS

Status Reports

  • Collaboration Meeting, September 2024
  • Collaboration Meeting, September 2023
  • Collaboration Meeting, May 2023
  • Collaboration Meeting, February 2023
  • Collaboration Meeting, September 2022
  • Collaboration Meeting, May 2022
  • Collaboration Meeting, Winter 2022
  • Collaboration Meeting, Spring 2021
  • Collaboration Meeting, Winter 2021
  • Collaboration Meeting, Spring 2020
  • Collaboration Meeting, Fall 2019
  • Collaboration Meeting, Summer 2019


FCAL2 Readiness Review

Supplementary Material

  • CCAL performance and FCAL2 module design, Nucl.Instrum.Meth.A 1013 (2021) 165683
  • NIM paper on the crystal properties, Nucl.Instrum.Meth.A 956 (2020) 163375
Retrieved from "https://halldweb.jlab.org/wiki/index.php?title=FCAL_Insert&oldid=128316"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Main page
  • Recent changes
  • Random page
  • Help

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
  • Cite this page
Powered by MediaWiki
  • Privacy policy
  • About GlueXWiki
  • Disclaimers