Run Planning Meeting Notes, August 20-26, 2020
From GlueXWiki
<- Back to Run Coordination Meetings:Summer2020
Friday, August 21
- Announcements
- MEDCON 5 restrictions reminder
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
- Last 24 hours:
- Report/issues:
- Pending issues:
- TAGM control boards (Nick, Richard).
- Run Plan
- TAC run on Friday while Hall C is down for target change
Thursday, August 20
- Last 24 hours
- Good production
- Started Low current cycle
- Report/issues:
- Data rate fluctuations: https://logbooks.jlab.org/entry/3831398
- Energy value dropped to 0 called MCC to fix. Something to watch for. https://logbooks.jlab.org/entry/3831173
- Problems with RootSpy and hydra. Fixed by restarting backend services from GUI. (Sergey)
- Pending issues:
- TAGH Disc counter not functioning properly (Sasha)
- TAGM control boards (Nick, Richard).
- Run Plan
- Continue low current running
- TAC run on Friday while Hall C is down for target change