Run Planning Meeting Notes, Mar 04-Mar 11, 2020
From GlueXWiki
<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count
Thursday, March 5
- Last 24 hours
- Beam off until Wednesday @ 5 pm for injector work
- FCAL work and restoration
- New PDU installed (Nick)
- Restoration: [1][2] (Nick/Colin)
- Solenoid Vapor Cooled Lead (VCL) temperature drop (Mark)
- Reports/Issues
- Accelerator status GUI (Naomi)
- Tagger magnet NMR signal (Tim)
- Tagger field change to photon energy calibration (Richard)
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- ρ and ω yield/trigger back to nominal values: e.g. Run 72076 (Alex)
- Change of timestamp (Logbook entry?)
- Rates instability (Alexandre)
- Run Plan
- Access for Solenoid work (?)
- Production