Nov 10, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 08:14, 11 November 2011 by Elton (Talk | contribs)

Jump to: navigation, search

Action Items from previous meetings

  1. Verify location of standoffs for circuit board. (Fernando)
  2. Location and room for UFL connector for thermistor needs to be finalized. (Chris and Jim)
  3. Jack to update board with bias compensation circuitry (Jack)
  4. The RTDs will need a controller. Scot will see if Hall D has an existing one that can be used; otherwise one will be ordered.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Programming
    6. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: