Thursday, September 30
- In last 24 hours:
- Early Riser summary:
- Owl summary:
- Swing summary:
- Day summary
- During downtime for maintenance:
- BCAL pedestal calibration (Sergey)
- FCAL base replacement (Rebecca)
- Issues:
- FCAL:
- Dead channels https://logbooks.jlab.org/entry/3914386 (ig)
- 53 suspicious channels https://logbooks.jlab.org/entry/3913947 https://logbooks.jlab.org/entry/3913739 (Rebecca/Mark/Malte)
- Sweep magnet turn off https://logbooks.jlab.org/entry/3913900 (Simon)
- Bleedthrough
- FCAL:
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
- 100 nA CDC & FDC turn off (2 shifts)
- 200 nA CDC & FDC turn off (8.4 shifts)
- Remove Be target to take empty target