Difference between revisions of "April 23, 2020 CPP Design Meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink * Present - Elton, Dave, Stephanie, Llya, Rory (re...") |
(→Agenda) |
||
Line 8: | Line 8: | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items | ||
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf | * Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf | ||
− | * | + | * Alignment tolerances |
+ | ** Relative to Beamline | ||
+ | *** Steel Absorbers, x,y,z | ||
+ | *** Lead Absorber, x,y,z | ||
+ | *** Detectors, x,y,z | ||
+ | ** Relative to one another | ||
+ | ** Repeatability | ||
* Things to work out | * Things to work out | ||
** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]] | ** Electronics shielding [[Media:Muon_Chamber_Shielding.pdf]] |
Revision as of 08:28, 23 April 2020
Meeting Time and Place =
Thursday April 23, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink
- Present - Elton, Dave, Stephanie, Llya, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_2,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
- Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
- Alignment tolerances
- Relative to Beamline
- Steel Absorbers, x,y,z
- Lead Absorber, x,y,z
- Detectors, x,y,z
- Relative to one another
- Repeatability
- Relative to Beamline
- Things to work out
- Electronics shielding Media:Muon_Chamber_Shielding.pdf
- Grounding Media:Muon_Chamber_dimensions.pdf
- Complete structural analysis
- Develop installation plan
Minutes and Action Items
- Reviewed minutes of last meeting
- We looked at Rory's pictures and discussed the 3D model that Stephanie shared
- looking at space on platform, we decided to leave the vertical cable managers so we have some space margin in the future
- Need to develop a dimensional layout of 3D model -- Stephanie
- Note: The chamber currently in the hall has different thickness dimensions than the new ones
- New chambers are 2.09" thick skin to skin
- Need to develop an installation procedure -- Tim/Stephanie
- Need to separate the 2 DS chambers for the electronics RF shielding
- Rory to supply the gauge and dimensions of the shield
- Stephanie to update geometry in 3D model
- Floor rail system design needed to allow CPP to move along with the FCAl platform
- Tim to supply sketch
- Stephanie to create 3D model and drawings
- Dark Room Structure
- Tim to supply sketch for structural needs
- Stephanie to update 3D model and create drawings
- New structural members need to be installed before skin removal
- Next meeting to be 1:30 to avert a time conflict