Line 10: | Line 10: | ||
#** | #** | ||
#** Since then the rate has been ~stable | #** Since then the rate has been ~stable | ||
+ | #* [https://logbooks.jlab.org/entry/3799097 Convergence] | ||
#* Multiple processes running to different edge fitting scripts caused fluctuations (Mark D) | #* Multiple processes running to different edge fitting scripts caused fluctuations (Mark D) | ||
− | #** New edge fitting script in use to better | + | #** New edge fitting script in use to better [https://logbooks.jlab.org/entry/3799337 monitor edge and width] (Mark D) |
#* [https://logbooks.jlab.org/entry/3799518 Collecting events before run start] | #* [https://logbooks.jlab.org/entry/3799518 Collecting events before run start] | ||
#* Monitoring: | #* Monitoring: | ||
#** [https://logbooks.jlab.org/entry/3799996 BCAL hot channel] --> pedestal calibration needed (Mark) | #** [https://logbooks.jlab.org/entry/3799996 BCAL hot channel] --> pedestal calibration needed (Mark) | ||
#* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni) | #* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni) | ||
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3799352 gluonraid2 filled up] and [https://logbooks.jlab.org/entry/3799401 emptied by hand] (David) |
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes) | #* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes) | ||
# Run Plan (Friday + Weekend) | # Run Plan (Friday + Weekend) |
Revision as of 08:13, 9 March 2020
<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count
Monday, March 9
- Last 72 hours
- Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
- Production running when beam available over the weekend
- Reports/Issues
- Rates instability: requested other Hall beam off and Harp Scan during "dip" in rate on Friday evening.
- Since then the rate has been ~stable
- Convergence
- Multiple processes running to different edge fitting scripts caused fluctuations (Mark D)
- New edge fitting script in use to better monitor edge and width (Mark D)
- Collecting events before run start
- Monitoring:
- BCAL hot channel --> pedestal calibration needed (Mark)
- something weird is fixed, was a bad ADC channel (Beni)
- gluonraid2 filled up and emptied by hand (David)
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- Rates instability: requested other Hall beam off and Harp Scan during "dip" in rate on Friday evening.
- Run Plan (Friday + Weekend)
- Production
- Longer term
- Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.
Friday, March 6
- Last 24 hours
- Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
- Steady production evening and overnight
- Reports/Issues
- Rates instability: Added additional beam positions to "default" MyaViewer
- No major instability overnight. Still plan to request other Hall beam off and Harp Scan if another "dip" in rate of 30% or more is identified by shift crew.
- Look back at other halls during previous instabilities (Alexandre)
- Fluctuating coherent edge for 45/135 PERP (Naomi)
- ρ and ω yield/trigger (almost) back to nominal values:
- something weird (Beni)
- Updated reference plots: thanks Naomi! Experts please check your e-mails. [1]
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- Rates instability: Added additional beam positions to "default" MyaViewer
- Run Plan (Friday + Weekend)
- May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
- Production
- Longer term
- Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.
Thursday, March 5
- Last 24 hours
- Beam off until Wednesday @ 5 pm for injector work
- FCAL work and restoration
- New PDU installed (Nick)
- Restoration: [2][3] (Nick/Colin)
- Solenoid Vapor Cooled Lead (VCL) temperature drop (Mark)
- Reports/Issues
- Accelerator status GUI (Naomi)
- Tagger magnet NMR signal (Tim)
- Tagger field change to photon energy calibration (Richard)
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- ρ and ω yield/trigger back to nominal values: e.g. Run 72076 (Alex)
- Change of timestamp (Logbook entry?)
- Rates instability (Alexandre)
- Run Plan
- Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
- Production