Line 4: | Line 4: | ||
** Vacuum alarms | ** Vacuum alarms | ||
* Power outage | * Power outage | ||
+ | ** UPS failed at 8:48am on April 22 ?? All servers on the UPS got rebooted. | ||
+ | ** Servers in the counting house were not accessible after reboot. | ||
+ | ** UPS ran out of charge on the afternoon on April 22 | ||
+ | ** Some PLC-s did not reconnect to network when power came back | ||
* Wiener MPOD for PS/ST u1-10-top . | * Wiener MPOD for PS/ST u1-10-top . | ||
* Remote resets (Hovanes, Nick) | * Remote resets (Hovanes, Nick) |
Latest revision as of 11:00, 1 May 2019
- Announcements
- Solenoid status (Tim,Beni)
- Magnet warmup
- Vacuum alarms
- Power outage
- UPS failed at 8:48am on April 22 ?? All servers on the UPS got rebooted.
- Servers in the counting house were not accessible after reboot.
- UPS ran out of charge on the afternoon on April 22
- Some PLC-s did not reconnect to network when power came back
- Wiener MPOD for PS/ST u1-10-top .
- Remote resets (Hovanes, Nick)
- Three VME crates used by OPS for our controls
- CAEN HV crates
- PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate
- Test setup for power crates (Nick)
- TOF upgrades
- DIRC installations
- Other business
Time/Location
10:00AM Thursday 2-May-2019 CC B101