Controls Meeting 2-May-2019

From GlueXWiki
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni)
    • Magnet warmup
    • Vacuum alarms
  • Power outage
    • UPS failed at 8:48am on April 22 ?? All servers on the UPS got rebooted.
    • Servers in the counting house were not accessible after reboot.
    • UPS ran out of charge on the afternoon on April 22
    • Some PLC-s did not reconnect to network when power came back
  • Wiener MPOD for PS/ST u1-10-top .
  • Remote resets (Hovanes, Nick)
    • Three VME crates used by OPS for our controls
    • CAEN HV crates
    • PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate
  • Test setup for power crates (Nick)
  • TOF upgrades
  • DIRC installations
  • Other business

Time/Location

10:00AM Thursday 2-May-2019 CC B101