Difference between revisions of "March 29, 2017, Production & Analysis Working Group"
From GlueXWiki
(→Data Production) |
(→Studies: Beamline & Triggering) |
||
Line 50: | Line 50: | ||
# Beam energy --- Beamline Group | # Beam energy --- Beamline Group | ||
# Polarization (TPOL & lineshape) --- Beamline Group | # Polarization (TPOL & lineshape) --- Beamline Group | ||
+ | # Beam Asymmetries --- Alex Austregesilo | ||
+ | #* [https://halldweb.jlab.org/wiki/images/3/35/Rho_2017.pdf Rho Polarization 2017] | ||
# Trigger emulation --- Alex Somov | # Trigger emulation --- Alex Somov | ||
# Triggering efficiency --- Alex Somov | # Triggering efficiency --- Alex Somov |
Revision as of 13:55, 29 March 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday March 29, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326-327.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
- To join via phone, use one of the following numbers and the Conference ID: 115815824.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Reconstruction & Analysis Studies Status
Agenda
- Announcements
- Data Production
- Analysis Focus
- This Week's Studies
- Any other studies
- Upcoming Study Schedule
This Week's Topics
- Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
- Talks should be limited to 10 + 5 minutes.
Data Production
- Monitoring Update --- Thomas Britton
- Calibration Update --- Sean Dobbs
- ver01 Recon Checklist
- RunPeriod-2017-01 Validation
- Some of the microscope timings are off:
- Preparing for the first Spring 2017 production launch
- Processing Update --- Alex Austregesilo
Analysis Focus: Total Cross Sections
- J/Ψ, φ --- Lubomir
- η, ρ, ω, φ --- ω cross section for several amorphous runs with tagger coincidence--Simon
- φ --- Thomas
- Any others?
Studies: Beamline & Triggering
Updates on experiment, simulation, and the comparison between the two.
- Flux --- Justin
- Beam energy --- Beamline Group
- Polarization (TPOL & lineshape) --- Beamline Group
- Beam Asymmetries --- Alex Austregesilo
- Trigger emulation --- Alex Somov
- Triggering efficiency --- Alex Somov
Data Production Milestones
- Fri. April 7 - Finalize calibrations/software for low-rate running. Run final tests.
- Fri. April 14 - Start production for low-rate running.
- Fri. April 21 - Finalize calibrations/software for high-rate running. Run final tests.
- Fri. April 28 - Start production for high-rate running.
Upcoming Study Schedule
- Updates on experiment, simulation, and the comparison between the two.
- Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
- All talks should be limited to 10 + 5 minutes.
- Next Week: Hit Efficiencies
(i.e. Is the detector working?)
- CDC Hit Efficiencies --- Naomi Jarvis
- FDC Hit Efficiencies --- Alex Austregesilo
- BCAL Hit Efficiencies --- Elton Smith
- FCAL Hit Efficiencies --- Jon Zarling
- Week after next: Alignment & Track/Shower Efficiencies
(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.
- Drift chamber alignment --- Mike Staib
- Tracking Efficiencies --- Paul Mattione
- BCAL Shower Efficiencies --- Elton Smith
- FCAL Shower Efficiencies --- Jon Zarling
- The following week: Other
- Track / Hit Matching: BCAL, FCAL, TOF, SC --- Paul Mattione
- Efficiencies: TOF, SC
- Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
- Uncertainties: PID (BCAL, FCAL, TOF, dE/dx), Kinfit (BCAL, FCAL, tracking)
- Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
- Other reconstruction/analysis issues