Difference between revisions of "GlueX TOF Meeting, March 8, 2016"
From GlueXWiki
(Created page with "GlueX Time-of-Flight Meeting<br> Tuesday, March 8, 2016<br> 11:00 am EST<br> JLab: CEBAF Center, Room F326/327 ==Agenda== # Announcements # Review of GlueX TOF Meeting, Fe...") |
(→Agenda) |
||
Line 15: | Line 15: | ||
#** [https://mailman.jlab.org/pipermail/halld-pid/2016-March/000867.html Log entries] | #** [https://mailman.jlab.org/pipermail/halld-pid/2016-March/000867.html Log entries] | ||
#* TDC delay parameter scan | #* TDC delay parameter scan | ||
+ | #** [https://logbooks.jlab.org/entry/3385667 Beni's log entry] | ||
+ | #* [https://logbooks.jlab.org/entry/3386174 More TOF peak hits] | ||
# NIM paper | # NIM paper | ||
Revision as of 17:34, 7 March 2016
GlueX Time-of-Flight Meeting
Tuesday, March 8, 2016
11:00 am EST
JLab: CEBAF Center, Room F326/327
Contents
Agenda
- Announcements
- Review of minutes from the previous meeting
- Calibration Status FSU
- Calibration Status JLab
- Run Status
- HV scan
- TDC delay parameter scan
- More TOF peak hits
- NIM paper
Communication
- The BlueJeans Meeting number is 350 531 998.
- Enter BlueJeans Meeting
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2016
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2016/ .
Minutes
Present:
- FSU: Sasha Ostrovidov
- JLab: Mark Ito (chair), Beni Zihlmann
Announcements
There the arc magnet problem has delayed the run plan.
Collaboration Meeting
Sasha will be giving the talk.
Run Readiness
- HV scan. Sasha has prepared files to step the high voltages when we do the scan. With the delay in the schedule, we decided to propose that we wait until Sasha is here at the end of February and on shift so that he can execute the plan.
- TDC delay parameter scan. The files are ready for download and Sascha Somov has prepared the configuration to download them automatically. Beni would like to do a before and after comparison of the effect of the constants before we put them into production.