Difference between revisions of "2015-01-07"
From GlueXWiki
(→Detector Status) |
(→Detector Status) |
||
Line 27: | Line 27: | ||
** Electronics Activities | ** Electronics Activities | ||
** Other Activities | ** Other Activities | ||
− | * Beamline Status [[BLTWG Meeting | + | * Beamline Status [[BLTWG Meeting 1/05/2015|January 5, 2015]] |
** Active Collimator | ** Active Collimator | ||
** Pair Spectrometer | ** Pair Spectrometer | ||
Line 34: | Line 34: | ||
** Diamonds | ** Diamonds | ||
** Polarimeter | ** Polarimeter | ||
− | * Start Counter [[GlueX Start Counter Meeting, | + | * Start Counter [[GlueX Start Counter Meeting, December 12, 2014#Minutes|December 12, 2014]] |
− | * Tracking [[Minutes-12- | + | * Tracking [[Minutes-12-18-2014|Joint FDC/CDC Meeting December 18, 2014]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
** FADC FPGA [[FADC_Data_Format_December_9,_2014 |December 9, 2014]] | ** FADC FPGA [[FADC_Data_Format_December_9,_2014 |December 9, 2014]] | ||
− | * Calorimeters: [[Dec | + | * Calorimeters: [[Dec 18, 2014 Calorimetry | December 18, 2014]] |
− | ** FCAL | + | ** FCAL |
** BCAL | ** BCAL | ||
− | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014- | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-12-12 | December 12, 2014]] |
* TOF [[GlueX TOF Meeting, December 2, 2014|December 2, 2014]] | * TOF [[GlueX TOF Meeting, December 2, 2014|December 2, 2014]] | ||
* Online Data Taking Reports | * Online Data Taking Reports | ||
Line 49: | Line 49: | ||
** DAQ | ** DAQ | ||
** Monitoring | ** Monitoring | ||
− | * Offline Analysis [[GlueX Offline Meeting, | + | * Offline Analysis [[GlueX Offline Meeting, December 10, 2014|December 10, 2014]] |
** Software Status | ** Software Status | ||
− | ** Data Quality | + | ** Data Quality |
** Offline Monitoring | ** Offline Monitoring | ||
− | ** Calibration [[December | + | ** Calibration [[December 17, 2014 Calibration| December 17, 2014]] |
* Physics Analysis | * Physics Analysis | ||
Revision as of 11:58, 5 January 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday January 7, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
- Software Review
Detector Status
- Engineering Activities
- Infrastructure
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status January 5, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter December 12, 2014
- Tracking Joint FDC/CDC Meeting December 18, 2014
- CDC
- FDC
- FADC FPGA December 9, 2014
- Calorimeters: December 18, 2014
- FCAL
- BCAL
- BCAL Reconstruction December 12, 2014
- TOF December 2, 2014
- Online Data Taking Reports
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Analysis December 10, 2014
- Software Status
- Data Quality
- Offline Monitoring
- Calibration December 17, 2014
- Physics Analysis
Other Activities
- PID Upgrades August 29, 2014
- Software (Level-3) September 2, 2014
- Technical Construction Report
- AOT