: 2. [[Media:D00000-19-01-P004.docx | Counter fabrication]] | : 2. [[Media:D00000-19-01-P004.docx | Counter fabrication]] | ||
:* Inspection (measurement) of scintillators and light guides. Record parameters (work performed at JLab/CUA). | :* Inspection (measurement) of scintillators and light guides. Record parameters (work performed at JLab/CUA). | ||
− | :* | + | :* [[Media:D00000-19-01-P002.docx | Gluing PMTs to light guides (gluing fixture, joint inspection)]] |
− | + | ||
:* Wrapping light guides and PMTs | :* Wrapping light guides and PMTs | ||
:* Mounting support collar on light guides | :* Mounting support collar on light guides |
Revision as of 09:23, 26 September 2013
Contents
Date and Time
10:00 am, August 30, 2013, room F326
Video Connection information if needed
JLab Conference Room L102
- ESNET and EVO session
- Phone only if requested:
- +1-866-740-1260 : US
- access code: 3421244# (remember the "#"). Phone line by request only.
Participants
CUA
- Franz Klein (Professor of Physics)
JLab reviewers
- Fernando Barbosa (Hall D eletrical engineer)
- Eugene Chudakov (Hall D group leader)
- William Crahen (Hall D engineer)
- Glenn Young (Associate Project Manager for Physics)
- Mark Ito (Hall D Staff)
- Bruce Lenzer (JLab ESH&Q)
- Vladimir Popov (JLab, ESH)
- Elton Smith (Hall D Staff)
- Alexander Somov (Hall D Staff, SOTR)
- Timothy Whitlatch (Hall D engineer)
- Jarrod Fitzpatrick (CFO)
Topics/Issues that need discussion/resolution
Documents on the Hodoscope Construction
Meeting Agenda
- 10:00 Scope of contract and current review
- 10:00 Overview of the Construction Facilities at CUA
- 10:30 Review construction procedures
- Fabricating/Checking PMT assemblies ( Work performed at JLab )
- Preparing cables (Nathan/Natalie)
- Soldering dividers/amplifiers/cables (Nick/Chris)
- Check Assembly performance
- Gain
- High-rate performance
- Record PMT performance parameters in the construction page
- 2. Counter Fabrication
- 2. Counter fabrication
- Inspection (measurement) of scintillators and light guides. Record parameters (work performed at JLab/CUA).
- Gluing PMTs to light guides (gluing fixture, joint inspection)
- Wrapping light guides and PMTs
- Mounting support collar on light guides
- Installing PMT assembly housing
- Installing counters in the mounting frame (position and alignment checks)
- Final bench tests (HV, electronics)
- Installation of counter frames in the Hall
- Installation procedures
- Final Tests
- Review Technical Documents
- Construction Plan
- Testing procedures
- Quality Assurance Plans and Acceptance Test Plans
- Documentation and Travelers
- Personnel training
Contract Related Documents