Difference between revisions of "GlueX TOF Meeting, August 18, 2011"
From GlueXWiki
(copy of last time, essentially) |
(present) |
||
Line 33: | Line 33: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Present: | ||
+ | * '''FSU''': Sasha Ostrovidov | ||
+ | * '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann | ||
+ | |||
+ | |||
+ | schedule | ||
+ | budget | ||
+ | resolution | ||
+ | |||
+ | send copy to sasha of sow | ||
+ | |||
+ | talk to dan about scintillator specification | ||
+ | |||
+ | 50% 132 ps | ||
+ | 80% 126 ps | ||
+ | 20% about same as 50 50 | ||
+ | |||
+ | roatrate test had mechanical difficulties | ||
+ | |||
+ | drawings on tof page | ||
+ | |||
+ | last times minutes | ||
+ | |||
+ | sow | ||
+ | purchase | ||
+ | tube type |
Revision as of 11:37, 18 August 2011
Contents
Location, Time
Thursday, August 18, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326
Agenda
- Announcements
- Minutes from the last meeting
- Prototype Status
- Contract Status
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 10 4388
Telephone
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .
Minutes
Present:
- FSU: Sasha Ostrovidov
- JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann
schedule
budget
resolution
send copy to sasha of sow
talk to dan about scintillator specification
50% 132 ps 80% 126 ps 20% about same as 50 50
roatrate test had mechanical difficulties
drawings on tof page
last times minutes
sow purchase tube type