====Should we use ControlNet as well as Ethernet/IP in the hall?====
+
* '''Should we use ControlNet as well as Ethernet/IP in the hall?'''
* '''Notes'''
+
** '''Notes'''
** Is there really a network reliability problem?
+
*** Is there really a network reliability problem?
** Would we have to run a copper line to the counting house?
+
*** Would we have to run a copper line to the counting house?
** Should we use an additional PLC in the hall?
+
*** Should we use an additional PLC in the hall?
** Should we locate the main PLC in the hall?
+
*** Should we locate the main PLC in the hall?
* '''Resolution'''
+
** '''Resolution'''
** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
+
*** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
  
  
==== When should we use a PC104 vs an IOC on a PC vs direct PLC control?====
+
* '''When should we use a PC104 vs an IOC on a PC vs direct PLC control?'''
* '''Notes'''
+
** '''Notes'''
** Should the FDC gas system use just PLC control and not use a PC104?
+
*** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 12:02, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP in the hall?
    • Notes
      • Is there really a network reliability problem?
      • Would we have to run a copper line to the counting house?
      • Should we use an additional PLC in the hall?
      • Should we locate the main PLC in the hall?
    • Resolution
      • Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.


  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Notes
      • Should the FDC gas system use just PLC control and not use a PC104?