Difference between revisions of "Controls To Do List"

From GlueXWiki
Jump to: navigation, search
 
m
Line 4: Line 4:
 
** Should we locate the main PLC in the hall?
 
** Should we locate the main PLC in the hall?
  
 
+
* When should we use a PC104 vs an IOC on a PC vs direct PLC control?
* another item
+
** Should the FDC gas system use just PLC control and not use a PC104?

Revision as of 09:04, 3 June 2011

  • Should we use ControlNet as well as Ethernet/IP?
    • Would we have to run a copper line to the counting house?
    • Should we use an additional PLC in the hall?
    • Should we locate the main PLC in the hall?
  • When should we use a PC104 vs an IOC on a PC vs direct PLC control?
    • Should the FDC gas system use just PLC control and not use a PC104?