Difference between revisions of "May 31, 2011 Readout"
From GlueXWiki
Line 31: | Line 31: | ||
= Minutes = | = Minutes = | ||
− | ''Attending: | + | ''Attending:Tim, David, Beni, Eugene, Elton, Yi (JLab); Christina, George, Pavlos (Athens); Alam, Serguei (USM); Andrei (UofR) |
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Monitoring | ||
+ | #* Several exchanges with Kappos last week. Considering the use of flex-boards instead of ribbon cable. Factory in England, but should be practical | ||
+ | #* new LEDs received. New measurements in progress. Report at next meeting | ||
+ | #* | ||
+ | # [[MEDIA:20110531-USM-Update.pdf|USM Update]] | ||
+ | # SiPM update | ||
+ | # Electrical/cooling (Elton) | ||
+ | # Geometry and light guides | ||
+ | # Simulations |
Revision as of 12:46, 31 May 2011
Teleconference Time: 11:00 a.m. EST
- ESNET 8542553 and EVO session
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone:
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Items for followup from previous meeting
-
Check if connections for cooling fluid can be bent radially outward to minimize affect on photons in the gap.Yes. Simulations of impact needed. -
Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box)Less than 250 microW/ board. -
SiPM: check cross talk between cells (Yi and Carl)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- USM Update
- SiPM update
- Electrical/cooling (Elton)
- Geometry and light guides
- Simulations
Minutes
Attending:Tim, David, Beni, Eugene, Elton, Yi (JLab); Christina, George, Pavlos (Athens); Alam, Serguei (USM); Andrei (UofR)
- Announcements
- Review of Action Items
- Monitoring
- Several exchanges with Kappos last week. Considering the use of flex-boards instead of ribbon cable. Factory in England, but should be practical
- new LEDs received. New measurements in progress. Report at next meeting
- USM Update
- SiPM update
- Electrical/cooling (Elton)
- Geometry and light guides
- Simulations