Difference between revisions of "May 24, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 16: | Line 16: | ||
# Fcal | # Fcal | ||
#* Decide on the extent of checking glass blocks recently shipped from IU (JLab) | #* Decide on the extent of checking glass blocks recently shipped from IU (JLab) | ||
− | # Simulation | + | # <strike> Simulation Studies ongoing </strike>. David coordinating task force. |
#* Need to study the reconstruction efficiency. | #* Need to study the reconstruction efficiency. | ||
#* Check timing resolution at 90 deg compared to beam test | #* Check timing resolution at 90 deg compared to beam test |
Revision as of 16:26, 24 May 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
- Fcal
- Decide on the extent of checking glass blocks recently shipped from IU (JLab)
-
Simulation Studies ongoing. David coordinating task force.- Need to study the reconstruction efficiency.
- Check timing resolution at 90 deg compared to beam test
- Check inefficiencies compared to previous studies by Mihajlo.
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Any other business
Minutes
Attending: