Difference between revisions of "Coil Test Weekly Meeting 13-May-2011"
From GlueXWiki
m |
m |
||
Line 14: | Line 14: | ||
** PLC and HMI programming | ** PLC and HMI programming | ||
** real-time graphics for VME-based fast DAQ | ** real-time graphics for VME-based fast DAQ | ||
− | * | + | * Documentation |
+ | ** In Process Inspections (IPI's) | ||
+ | ** trip chains | ||
* Status of other tests: VME/VXS crates, HV/LV crates, SiPM's | * Status of other tests: VME/VXS crates, HV/LV crates, SiPM's | ||
* [[For_the_third_coil|To-do list]] for the next coil | * [[For_the_third_coil|To-do list]] for the next coil |
Revision as of 08:39, 13 May 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 13-May-2011 9:30 am ARC 231
Agenda
- Coil 3 status
- Note: prepare for powered operations this Mon 16-May!
- Danfysik power transistor, fault sequencer and slow dump
- PLC and HMI programming
- real-time graphics for VME-based fast DAQ
- Documentation
- In Process Inspections (IPI's)
- trip chains
- Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- short to ground
- IRMIS
- giving up on JBoss, switching to GlassFish
- Preparing for moving into the hall