Coil Test Weekly Meeting 13-May-2011

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 13-May-2011 9:30 am ARC 231


Agenda

  • Coil 3 status
    • Note: prepare for powered operations this Mon 16-May!
    • Danfysik power transistor, fault sequencer and slow dump
    • PLC and HMI programming
    • real-time graphics for VME-based fast DAQ
  • Documentation
    • In Process Inspections (IPI's)
    • trip chains
  • Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
    • short to ground
  • IRMIS
  • Preparing for moving into the hall