Coil Test Weekly Meeting 13-May-2011
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 13-May-2011 9:30 am ARC 231
Agenda
- Coil 3 status
- Note: prepare for powered operations this Mon 16-May!
- Danfysik power transistor, fault sequencer and slow dump
- PLC and HMI programming
- real-time graphics for VME-based fast DAQ
- Documentation
- In Process Inspections (IPI's)
- trip chains
- Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- short to ground
- IRMIS
- giving up on JBoss, switching to GlassFish
- IRMIS at JLab
- Preparing for moving into the hall