Difference between revisions of "Coil Test Weekly Meeting 13-May-2011"
From GlueXWiki
m |
m |
||
Line 10: | Line 10: | ||
* Coil 3 status | * Coil 3 status | ||
− | ** | + | ** Note: prepare for powered operations this Mon 16-May! |
** Danfysik power transistor, fault sequencer and slow dump | ** Danfysik power transistor, fault sequencer and slow dump | ||
** PLC and HMI programming | ** PLC and HMI programming |
Revision as of 09:41, 12 May 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 13-May-2011 9:30 am ARC 231
Agenda
- Coil 3 status
- Note: prepare for powered operations this Mon 16-May!
- Danfysik power transistor, fault sequencer and slow dump
- PLC and HMI programming
- real-time graphics for VME-based fast DAQ
- Document trip chains
- Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- short to ground
- IRMIS
- giving up on JBoss, switching to GlassFish
- Preparing for moving into the hall