Difference between revisions of "Coil Test Weekly Meeting 13-May-2011"

From GlueXWiki
Jump to: navigation, search
m
 
m
Line 19: Line 19:
 
** measure UPS lifetime under operating conditions
 
** measure UPS lifetime under operating conditions
 
* Coil 2 repair status
 
* Coil 2 repair status
 +
** short to ground
 
* [http://irmis.sourceforge.net IRMIS]
 
* [http://irmis.sourceforge.net IRMIS]
 
** giving up on JBoss, switching to GlassFish
 
** giving up on JBoss, switching to GlassFish
 
* Preparing for moving into the hall
 
* Preparing for moving into the hall

Revision as of 09:38, 12 May 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 13-May-2011 9:30 am ARC 231


Agenda

  • Coil 3 status
    • we may be ready for powered operations this Mon 16-May
    • Danfysik power transistor, fault sequencer and slow dump
    • PLC and HMI programming
    • real-time graphics for VME-based fast DAQ
  • Document trip chains
  • Status of other tests: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
    • short to ground
  • IRMIS
    • giving up on JBoss, switching to GlassFish
  • Preparing for moving into the hall