Difference between revisions of "May 24, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Items for followup from previous meeting(s)) |
||
Line 14: | Line 14: | ||
# Monitoring | # Monitoring | ||
#* Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate. | #* Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate. | ||
+ | # Fcal | ||
+ | #* Decide on the extent of checking glass blocks recently shipped from IU (JLab) | ||
# Simulation | # Simulation | ||
#* Need to study the reconstruction efficiency. | #* Need to study the reconstruction efficiency. |
Revision as of 17:41, 26 April 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
- Fcal
- Decide on the extent of checking glass blocks recently shipped from IU (JLab)
- Simulation
- Need to study the reconstruction efficiency.
- Check timing resolution at 90 deg compared to beam test
- Check inefficiencies compared to previous studies by Mihajlo.
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Any other business
Minutes
Attending: