'''Agenda'''
 
'''Agenda'''
  
* [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Jonathan, Elliott  
+
* [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Josh, Jonathan, Elliott  
* Quench detection, fast/slow interlock chains for single coil test and full system - Elliott
+
** redundancy in quench detection and other systems
** do we need to schedule another meeting next week?
+
** redundant breaker in fast/slow interlock chains
** high-speed DAQ for monitoring/debugging?
+
** high-speed DAQ for diagnosis of electrical problems
* UPS on power supply control system - Mark S
+
** UPS on power supply control system
 +
** what needs to be done for the test vs for the experiment?
 
* PI Responsibilities during test - Jonathan
 
* PI Responsibilities during test - Jonathan
 
** Low power magnet testing 5A, 50A,100A  - Elliott
 
** Low power magnet testing 5A, 50A,100A  - Elliott
Line 32: Line 33:
 
** what else?
 
** what else?
 
* Magnet power supply and interlock commissioning - Mark S
 
* Magnet power supply and interlock commissioning - Mark S
** quench protection
+
** quench protector wiring
** shunt and ground fault detection
+
** shunt  
 +
** ground fault detection
 
** should strain gauges be in interlock system?
 
** should strain gauges be in interlock system?
 
* Controls racks - Scot
 
* Controls racks - Scot

Latest revision as of 08:51, 28 October 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 28-Oct-2010 9:30 am ARC 428


Agenda

  • Aftermath of Director's Review - George, Mark, Josh, Jonathan, Elliott
    • redundancy in quench detection and other systems
    • redundant breaker in fast/slow interlock chains
    • high-speed DAQ for diagnosis of electrical problems
    • UPS on power supply control system
    • what needs to be done for the test vs for the experiment?
  • PI Responsibilities during test - Jonathan
    • Low power magnet testing 5A, 50A,100A - Elliott
    • High power magnet testing 100-1500A - Elliott
    • Identify possible turn to turn shorts during ramping - Eugene
    • Assess Heim column centering in coil - George
    • Assess Axial column forces - George
    • Estimate LN2 and He heat leak - Jonathan
    • Assess LN2 and LHe thermal siphons - Jonathan
  • OSP status - Elliott
  • Hall probe - Mark S
  • Installation and commissioning status - all
    • pressure testing and certifications
    • pumping/purging
    • connection to cryo system
    • ODH on platform?
    • vacuum gate valve status
    • what else?
  • Magnet power supply and interlock commissioning - Mark S
    • quench protector wiring
    • shunt
    • ground fault detection
    • should strain gauges be in interlock system?
  • Controls racks - Scot
    • strain gauge and UPS interlocks
    • commissioning
    • hook up redundant sensors
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • what's left?
    • another tutorial
  • EPICS - Hovanes
    • communication with Cryo Group
    • connection to guard shack and notification conditions
    • pager status and strategy
  • HMI and EWEB programming - Yi, Hovanes
    • PID screens
    • program access to archived data
    • another tutorial
  • Coil repair status - George
  • Learn how to use Linux for web and email - Elliott
  • Solenoid review 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Hall D Technical web page
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • quench detector connections
    • connectors on next coil