'''Agenda''' | '''Agenda''' | ||
− | * [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Jonathan, Elliott | + | * [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Josh, Jonathan, Elliott |
− | * | + | ** redundancy in quench detection and other systems |
− | + | ** redundant breaker in fast/slow interlock chains | |
− | ** high-speed DAQ for | + | ** high-speed DAQ for diagnosis of electrical problems |
− | * UPS on power supply control system | + | ** UPS on power supply control system |
+ | ** what needs to be done for the test vs for the experiment? | ||
* PI Responsibilities during test - Jonathan | * PI Responsibilities during test - Jonathan | ||
** Low power magnet testing 5A, 50A,100A - Elliott | ** Low power magnet testing 5A, 50A,100A - Elliott | ||
Line 32: | Line 33: | ||
** what else? | ** what else? | ||
* Magnet power supply and interlock commissioning - Mark S | * Magnet power supply and interlock commissioning - Mark S | ||
− | ** quench | + | ** quench protector wiring |
− | ** shunt | + | ** shunt |
+ | ** ground fault detection | ||
** should strain gauges be in interlock system? | ** should strain gauges be in interlock system? | ||
* Controls racks - Scot | * Controls racks - Scot |
Latest revision as of 08:51, 28 October 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 28-Oct-2010 9:30 am ARC 428
Agenda
- Aftermath of Director's Review - George, Mark, Josh, Jonathan, Elliott
- redundancy in quench detection and other systems
- redundant breaker in fast/slow interlock chains
- high-speed DAQ for diagnosis of electrical problems
- UPS on power supply control system
- what needs to be done for the test vs for the experiment?
- PI Responsibilities during test - Jonathan
- Low power magnet testing 5A, 50A,100A - Elliott
- High power magnet testing 100-1500A - Elliott
- Identify possible turn to turn shorts during ramping - Eugene
- Assess Heim column centering in coil - George
- Assess Axial column forces - George
- Estimate LN2 and He heat leak - Jonathan
- Assess LN2 and LHe thermal siphons - Jonathan
- OSP status - Elliott
- Hall probe - Mark S
- Installation and commissioning status - all
- pressure testing and certifications
- pumping/purging
- connection to cryo system
- ODH on platform?
- vacuum gate valve status
- what else?
- Magnet power supply and interlock commissioning - Mark S
- quench protector wiring
- shunt
- ground fault detection
- should strain gauges be in interlock system?
- Controls racks - Scot
- strain gauge and UPS interlocks
- commissioning
- hook up redundant sensors
- anything else?
- PLC programming/testing status - Mark W
- UPS interlock
- what's left?
- another tutorial
- EPICS - Hovanes
- communication with Cryo Group
- connection to guard shack and notification conditions
- pager status and strategy
- HMI and EWEB programming - Yi, Hovanes
- PID screens
- program access to archived data
- another tutorial
- Coil repair status - George
- Learn how to use Linux for web and email - Elliott
- Solenoid review 7-Dec
- Purchase of another PLC and Ethernet module - Elliott
- Hall D Technical web page
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- quench detector connections
- connectors on next coil
- what else?