+ | * Reviewed minutes from last meeting | ||
+ | * Looked over Keith's 3D model with dimensions | ||
+ | ** Pavel to take a closer look to ensure they correspond to his conceptual design | ||
+ | ** Need to get accurate dimensions for the 20% Cu/80% W pieces | ||
+ | ** Looked at installation in tagger building and discussed space issues | ||
+ | ** Need to bring in magnet and girder into the 3D model | ||
+ | ** Borated Poly layer is not needed below the CPU | ||
+ | ** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation | ||
+ | ** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete | ||
+ | * Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1 | ||
+ | * Josh presented the Magnet spec and design | ||
+ | ** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish | ||
+ | ** Start modelling the magnet in NX and making drawings | ||
== Action Items == | == Action Items == |
Revision as of 16:24, 12 February 2024
Meeting Time and Place
Monday, February 12, 2024, 1pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting
- Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
- 3D model cross section with dimensions media:Dimensioned CPS cross section.png
- Possible cross section media:Baseline cross section.jpeg
- De-gaussing of Tagger magnet (all)
- Tagger magnet degaussing requirements (Hovanes)
- Magnet update (Josh) media:CPS Magnet Design.pdf
- Discuss path forward (Tim/all)
Minutes
- Reviewed minutes from last meeting
- Looked over Keith's 3D model with dimensions
- Pavel to take a closer look to ensure they correspond to his conceptual design
- Need to get accurate dimensions for the 20% Cu/80% W pieces
- Looked at installation in tagger building and discussed space issues
- Need to bring in magnet and girder into the 3D model
- Borated Poly layer is not needed below the CPU
- Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation
- the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete
- Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1
- Josh presented the Magnet spec and design
- Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish
- Start modelling the magnet in NX and making drawings