Difference between revisions of "Π polarizability Meeting Jun 1, 2022"
From GlueXWiki
(→Preliminary Agenda) |
|||
Line 48: | Line 48: | ||
== Action Items == | == Action Items == | ||
− | # Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew) | + | # <strike> Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew) </string> Plots have been produced but the reaction specification had a bug, so few entries were generated. Should work on next try </strike> |
− | # Schedule training for FCAL Darkroom and Pb shield alignment (Elton) | + | # <strike> Schedule training for FCAL Darkroom and Pb shield alignment (Elton) </strike> Training scheduled for Friday at 9:30. |
== Preliminary Agenda == | == Preliminary Agenda == | ||
Line 76: | Line 76: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: |
+ | |||
+ | # Previous CPP meeting: [[%CE%A0_polarizability_Meeting_May 18,_2022|May 18, 2022]] | ||
+ | # Previous CPP Software meeting: [[Π polarizability Software Meeting May 5, 2022]] | ||
+ | # Announcements | ||
+ | #* [[Run Coordination Meetings:Summer2022 | Run Coordinator Meetings]] | ||
+ | # Action Items | ||
+ | # CPP-NPP Trigger (Sasha) | ||
+ | # [[CPP and NPP Run Conditions]] | ||
+ | # Photon beam / tagger / diamonds | ||
+ | # Software/Calibration, Simulations | ||
+ | #* hdview2 event display | ||
+ | # MWPC Testing | ||
+ | #* [https://logbooks.jlab.org/book/hdfmwpc FMWPC Log Book] | ||
+ | #* [https://halldweb.jlab.org/talks/2022/CPP_NPP/ halldweb/talks/CPP_NPP] | ||
+ | # [[CPP and NPP Experiment Configuration]] | ||
+ | # DAQ and Electronic Setup (Sergey and Beni) | ||
+ | # Documentation (Elton and Simon) | ||
+ | #* See [https://halldweb.jlab.org/hdops/wiki/index.php/Approved_Procedures List of Approved Procedures] | ||
+ | #* [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Multi-Wire_Proportional_Chambers_Shift Description of FMWCP and CTOF for Shift Takers] | ||
+ | #* Tim has drafted a procedure to align the Pb picture-frame. | ||
+ | # Other business | ||
+ | # Next meeting |
Revision as of 11:12, 1 June 2022
09:30 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09
Meeting ID: 160 862 8791
Passcode: CPP
Elton Smith is inviting you to a scheduled ZoomGov meeting. Topic: CPP Weekly Meeting Time: This is a recurring meeting Meet anytime Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09 Meeting ID: 160 862 8791 Passcode: CPP One tap mobile +16692545252,,1608628791# US (San Jose) +16468287666,,1608628791# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 862 8791 Find your local number: https://jlab-org.zoomgov.com/u/acZK7hDWFf Join by SIP 1608628791@sip.zoomgov.com Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 160 862 8791 Passcode: 112160
Action Items
-
Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew) </string> Plots have been produced but the reaction specification had a bug, so few entries were generated. Should work on next try -
Schedule training for FCAL Darkroom and Pb shield alignment (Elton)Training scheduled for Friday at 9:30.
Preliminary Agenda
- Previous CPP meeting: May 18, 2022
- Previous CPP Software meeting: Π polarizability Software Meeting May 5, 2022
- Announcements
- Action Items
- CPP-NPP Trigger (Sasha)
- CPP and NPP Run Conditions
- Photon beam / tagger / diamonds
- Software/Calibration, Simulations
- hdview2 event display
- MWPC Testing
- CPP and NPP Experiment Configuration
- DAQ and Electronic Setup (Sergey and Beni)
- Documentation (Elton and Simon)
- See List of Approved Procedures
- Description of FMWCP and CTOF for Shift Takers
- Tim has drafted a procedure to align the Pb picture-frame.
- Other business
- Next meeting
Minutes
Attending:
- Previous CPP meeting: May 18, 2022
- Previous CPP Software meeting: Π polarizability Software Meeting May 5, 2022
- Announcements
- Action Items
- CPP-NPP Trigger (Sasha)
- CPP and NPP Run Conditions
- Photon beam / tagger / diamonds
- Software/Calibration, Simulations
- hdview2 event display
- MWPC Testing
- CPP and NPP Experiment Configuration
- DAQ and Electronic Setup (Sergey and Beni)
- Documentation (Elton and Simon)
- See List of Approved Procedures
- Description of FMWCP and CTOF for Shift Takers
- Tim has drafted a procedure to align the Pb picture-frame.
- Other business
- Next meeting