Difference between revisions of "Dec 22, 2008 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Items for followup from Dec 7 meeting) |
||
Line 12: | Line 12: | ||
#* Study impact of inactive material at the end of Bcal on acceptance. | #* Study impact of inactive material at the end of Bcal on acceptance. | ||
#* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | #* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | ||
− | # Report on the Bfield components in the region of the Bcal | + | # Report on the Bfield components in the region of the Bcal readout (JLab for next meeting). |
# Options for vendors delivering specific lead sheet sizes (Tim) | # Options for vendors delivering specific lead sheet sizes (Tim) | ||
Revision as of 11:57, 22 December 2008
Teleconference Time: 11:15 EST/10:15 CST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Items for followup from Dec 7 meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of Bcal on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Report on the Bfield components in the region of the Bcal readout (JLab for next meeting).
- Options for vendors delivering specific lead sheet sizes (Tim)
Documents to Review
Tentative Agenda
- Announcements
- FCAL Update
- BCAL Update
- Resolution studies (Blake)
- SiPMPlus uniformity results (George/Zisis)
- see images under 'Documents to Review'
- Magnetic Field Update (JLab)
- Kuraray Visit (Elton)
- GlueX collaboration meeting
- Any other business
Minutes
Attending: