Difference between revisions of "June 17, 2021 CPP Design Meeting"
From GlueXWiki
(→Minutes and Action Items) |
(→Minutes and Action Items) |
||
Line 29: | Line 29: | ||
* 4 MWPCs in house and safe in EEL | * 4 MWPCs in house and safe in EEL | ||
* Cable routing and length have been determined, Elton made a log entry | * Cable routing and length have been determined, Elton made a log entry | ||
+ | * CPP Support stand in house in TEDF and will be pre-assembled | ||
+ | * Preparing for floor rail survey and hole cutting of downstream platform | ||
+ | * CPP absorber steel awarded and in work |
Latest revision as of 10:28, 30 June 2021
Meeting Time and Place
Thursday Jun 17, 2021, 3:30pm Bluejeans https://bluejeans.com/465620466
- Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_17,_2021_CPP_Design_Meeting
- Chamber delivery
- OSP/Testing status - Beni
- Gas system status - Tim
- Cable routings
- Design/Fab/Procurement status
- Stand
- Steel
- Fcal platform mods
- Things to work out
- Gas system, manifold/bubblers (Beni has some)
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
- Modified US vacuum system
- Solid target installation
- Installation drawing including Microscope move
Minutes and Action Items
- Gas system tested and ready to go
- Beni submitted final OSP for testing
- 4 MWPCs in house and safe in EEL
- Cable routing and length have been determined, Elton made a log entry
- CPP Support stand in house in TEDF and will be pre-assembled
- Preparing for floor rail survey and hole cutting of downstream platform
- CPP absorber steel awarded and in work