+ | == Minutes == | ||
+ | |||
+ | Present: Paul Eugenio, Mark Ito, Tim Whitlatch, Beni Zihlmann | ||
+ | |||
+ | There is a [https://bluejeans.com/s/AZJnaZ2Ys9i/recording of this meeting]. Log into the [https://jlab.bluejeans.com BlueJeans site] first to gain access (use your JLab credentials). | ||
+ | |||
+ | We met briefly. | ||
+ | |||
+ | * Authorization for Paul to come on-site is in process. | ||
+ | * Beni will send Paul the coordinates of the PMTs to be replaced. | ||
+ | * There is a light guide with a broken joint. Performance seems acceptable despite that. Paul may take a look during his visit. Tim and Beni think that first, we should do no harm. | ||
+ | * We discussed the air light guide test. Tim noted that since the DIRC will not be installed during the coming run, physical interference for de-installation during the run, should that be called for, should not be an issue. | ||
+ | * FSU is building a remote shift control center in Tallahassee. Many, many computer monitors will be involved. | ||
+ | * Last week Survey and Alignment re-shot and re-fiducialized the TOF. The results are not back yet. | ||
+ | * Paul may delay his trip for a week; to be decided. | ||
+ | * We discussed shots. |
Revision as of 16:15, 19 May 2021
GlueX Time-of-Flight Meeting
Wednesday, May 19, 2021
10:00 am EDT
BlueJeans: 350 531 998
Agenda
- Announcements
- Review of minutes from the last meeting
- PMT Repair
- TOF II Trigger
- TOF NIM paper
- Action Item Recap
Minutes
Present: Paul Eugenio, Mark Ito, Tim Whitlatch, Beni Zihlmann
There is a of this meeting. Log into the BlueJeans site first to gain access (use your JLab credentials).
We met briefly.
- Authorization for Paul to come on-site is in process.
- Beni will send Paul the coordinates of the PMTs to be replaced.
- There is a light guide with a broken joint. Performance seems acceptable despite that. Paul may take a look during his visit. Tim and Beni think that first, we should do no harm.
- We discussed the air light guide test. Tim noted that since the DIRC will not be installed during the coming run, physical interference for de-installation during the run, should that be called for, should not be an issue.
- FSU is building a remote shift control center in Tallahassee. Many, many computer monitors will be involved.
- Last week Survey and Alignment re-shot and re-fiducialized the TOF. The results are not back yet.
- Paul may delay his trip for a week; to be decided.
- We discussed shots.