Difference between revisions of "Run Planning Meeting Notes, September 3 - 9, 2020"
From GlueXWiki
(→Thursday, September 3) |
|||
Line 16: | Line 16: | ||
# Last 24 hours: | # Last 24 hours: | ||
#* -10 am: straight-track data for GEM/TRD | #* -10 am: straight-track data for GEM/TRD | ||
− | #* Solenoid ramping up during RF recovery | + | #* Solenoid ramping up during RF recovery, 1352.6 A at 6:40 pm [https://logbooks.jlab.org/entry/3839678]. |
#* Beam comes back at 9:45 pm. [https://logbooks.jlab.org/entry/3839832 Harp scan]. | #* Beam comes back at 9:45 pm. [https://logbooks.jlab.org/entry/3839832 Harp scan]. | ||
# Reports/issues: | # Reports/issues: | ||
#* [https://logbooks.jlab.org/entry/3839712 RootSpy issues (Resolved)] | #* [https://logbooks.jlab.org/entry/3839712 RootSpy issues (Resolved)] | ||
− | #* [https://logbooks.jlab.org/entry/3839565 Solenoid] | + | #* [https://logbooks.jlab.org/entry/3839565 Solenoid ramping stopped at 800 A] |
#* [https://logbooks.jlab.org/entry/3839587 Test results of PWO crystals (test 5)] | #* [https://logbooks.jlab.org/entry/3839587 Test results of PWO crystals (test 5)] | ||
# Pending issues: | # Pending issues: |
Revision as of 07:27, 3 September 2020
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Thursday, September 3
- Last 24 hours:
- Reports/issues:
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
- Continue DIRC commissioning until 6 am tomorrow morning.
- De-installation work from 6 am (will take 2 - 3 hours)
- Resume production runs