Difference between revisions of "Run Planning Meeting Notes, August 20-26, 2020"
From GlueXWiki
Line 4: | Line 4: | ||
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet] | [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet] | ||
+ | |||
+ | |||
+ | == Friday, August 21 == | ||
+ | # Announcements | ||
+ | #* MEDCON 5 restrictions reminder | ||
+ | ## adhere to counting room capacity restrictions | ||
+ | ## maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK) | ||
+ | ## wear masks anytime more than one person present in the counting room | ||
+ | ## at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls. | ||
+ | ## food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others. | ||
+ | # Last 24 hours: | ||
+ | # Report/issues: | ||
+ | # Pending issues: | ||
+ | #* TAGM control boards (Nick, Richard). | ||
+ | # Run Plan | ||
+ | #* TAC run on Friday while Hall C is down for target change | ||
== Thursday, August 20 == | == Thursday, August 20 == | ||
Line 12: | Line 28: | ||
#* Data rate fluctuations: https://logbooks.jlab.org/entry/3831398 | #* Data rate fluctuations: https://logbooks.jlab.org/entry/3831398 | ||
#* Energy value dropped to 0 called MCC to fix. Something to watch for. https://logbooks.jlab.org/entry/3831173 | #* Energy value dropped to 0 called MCC to fix. Something to watch for. https://logbooks.jlab.org/entry/3831173 | ||
− | #* Problems with | + | #* Problems with RootSpy and hydra. Fixed by restarting backend services from GUI. (Sergey) |
# Pending issues: | # Pending issues: | ||
#* TAGH Disc counter not functioning properly (Sasha) | #* TAGH Disc counter not functioning properly (Sasha) | ||
Line 18: | Line 34: | ||
# Run Plan | # Run Plan | ||
#* Continue low current running | #* Continue low current running | ||
− | #* TAC run on Friday | + | #* TAC run on Friday while Hall C is down for target change |
Revision as of 09:20, 20 August 2020
<- Back to Run Coordination Meetings:Summer2020
Friday, August 21
- Announcements
- MEDCON 5 restrictions reminder
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
- Last 24 hours:
- Report/issues:
- Pending issues:
- TAGM control boards (Nick, Richard).
- Run Plan
- TAC run on Friday while Hall C is down for target change
Thursday, August 20
- Last 24 hours
- Good production
- Started Low current cycle
- Report/issues:
- Data rate fluctuations: https://logbooks.jlab.org/entry/3831398
- Energy value dropped to 0 called MCC to fix. Something to watch for. https://logbooks.jlab.org/entry/3831173
- Problems with RootSpy and hydra. Fixed by restarting backend services from GUI. (Sergey)
- Pending issues:
- TAGH Disc counter not functioning properly (Sasha)
- TAGM control boards (Nick, Richard).
- Run Plan
- Continue low current running
- TAC run on Friday while Hall C is down for target change